201209-201606,WilliamHill体育 学士
201609-201706,WilliamHill体育 硕士
201709-202206,WilliamHill体育 博士(硕转博)
202302-202502,香港理工大学,博士后
202502-至今,WilliamHill体育,讲师
[1] Zhang Q, Lusby R M, Shang P et al., Solving a multi-resolution model of the train platforming problem using Lagrangian Relaxation with dynamic multiplier aggregation. European Journal of Operational Research (2025), doi: https://doi.org/10.1016/j.ejor.2025.03.004
[2] Zhang Q, Lusby R M, Shang P, et al. A heuristic approach to integrate train timetabling, platforming, and railway network maintenance scheduling decisions[J]. Transportation Research Part B: Methodological, 2022, 158: 210-238
[3] Zhang Q, Lusby R M, Shang P, et al. Simultaneously re-optimizing timetables and platform schedules under planned track maintenance for a high-speed railway network[J]. Transportation Research Part C: Emerging Technologies, 2020, 121: 102823
[4] Xia T, Wang L, Zhang Q*, et al. Integrated scheduling of gantry cranes, container trucks and yard cranes in on-dock railway operation areas at multimodal container ports[J]. IET Intelligent Transport Systems, 2025, 19(1): e12600